|
|
|
|
Assignment forms - business premises
The Essential Services Commission requires accredited persons to develop Victorian energy efficiency certificate (VEEC) assignment forms to include all of the information and fields outlined in the documents below. As different mandatory information requirements are required for different prescribed activities, you must download and review the document that is relevant to the prescribed activity which you seek to undertake under the VEET scheme.
The mandatory information also varies depending on whether the installation is to take place in a residential premises or a business/non-residential premises. For residential sector assignment forms, navigate to the appropriate page using the menu on the left. If your assignment form changes after your original accreditation is issued, you will need to submit a copy to the commission for approval using the online portal available through your account. Refer to the explanatory note below for instructions. Please note: These forms are for use by accredited persons, not individual consumers. If you are a consumer, please contact an AP using the Register of participants on the left hand menu.
VEEC assignment forms - business premises |
Water heating activities |
Gas/LPG water heating (1A and 1B) |
Solar water heating (1E, 1F, 2B, 3B and 4B) |
Space heating and cooling activities |
Space heating and cooling (5,6,7,8,9,10,20 and 23) |
Gas ductwork replacement (28) |
Space conditioning activities |
Under floor insulation (12) |
Replacement of external window (13) | Retrofit of external window (14) |
Incandescent lighting replacement activities |
Installing low energy lighting (21A & 21B) |
Installing low energy lighting (21C, 21D, 21E, 21F) |
Shower rose activities |
Shower rose (17) |
Refrigerator or freezer activities |
Purchase of high efficiency refrigerator or freezer (22) |
Destroying pre-1996 refrigerator or freezer (19) |
Television activities |
Purchase of high efficiency television (24) |
Clothes dryer activities |
Installing clothes dryer (25) |
Pool pump activities |
Installing high efficiency pool pump (26) |
Standby power controller activities |
Installing standby power controller (29) | Motor activities | Installing high efficiency motor (31) | Refrigerated display cabinet activities | Installing high efficiency refrigerated display cabinet (32) | Refrigeration fan motor activities | Installing high efficiency refrigeration fan motor (33) | Lighting upgrade activities | Building-based lighting upgrade (34) - documentation pack coversheet template Building-based lighting upgrade (34) - assignment form template Building-based lighting upgrade (34) - data summary and AS/NZS 1680 compliance declaration templates Non-building based lighting upgrade (34) - documentation pack coversheet template Non-building based lighting upgrade (34) - assignment form template Non-building based lighting upgrade (34) - data summary and compliance declaration templates Non-building based lighting upgrade (34) - training identification matrix and installer qualification declaration
| Low flow trigger nozzle activities | Efficient low flow trigger nozzle replacing decommissioned inefficient trigger nozzle (35) | Prerinse spray valve activities | Installing water efficient prerinse spray valve (36) |
|
|